Home
Services
Engineering & Environmental Consulting
Operations & Maintenance
Environmental Remediation
Vertical Construction
Water & Wastewater
Apparel Manufacturing
Geography
Careers
Contact Us

Bethel Companies

Home
Services
Engineering & Environmental Consulting
Operations & Maintenance
Environmental Remediation
Vertical Construction
Water & Wastewater
Apparel Manufacturing
Geography
Careers
Contact Us
June 27, 2024
Construction
Guest User
Egegik City Shop

The City Shop is a 90’x150’ clear span metal building with 20’ eave heights. The building includes a concrete foundation, floor slab, exterior aprons, and a steel structure with insulated metal siding panels. Due to the extreme weather in Egegik, the building was designed to withstand wind and snow loads, as well as the seismic effects prescribed for the geographical area.

Egegik City Shop
October 1, 2018
Remediation
Samantha Baker
Nome Tank Demolition and Contaminated Soil ...

Bethel was contracted to perform a tank demolition and contaminated soil removal action and remediation at this FUDS.

Nome Tank Demolition and Contaminated Soil Removal
September 1, 2017
Operations
Samantha Baker
Polychlorinated Biphenyl (PCB) Management

Kadena Air Base requires support services to manage and process polychlorinated biphenyl (PCB) items in accordance with the latest Japanese Environmental Governing Standards (JEGS) and Toxic Substances Control Act (TSCA).

Polychlorinated Biphenyl (PCB) Management
March 14, 2017
Consulting
Samantha Baker
Compliance Monitoring at Two Sites, Camp Zama

Biannual compliance sampling is part of the compliance-related cleanup project plans for both the Camp Zama Old Landfill (CZOL) and the Logistics Readiness Center (LRC) Gas Station at Camp Zama, Japan. CZOL is a reclaimed landfill and currently supports a golf driving range, skeet range, and other uses.

Compliance Monitoring at Two Sites, Camp Zama
Guest User
December 1, 2020
Construction

Kobuk K-12 School Addition and Renovation

Guest User
December 1, 2020
Construction
Kobuk K-12 School Addition and Renovation

Bethel Services was awarded this Design-Build/Best-Value competitive procurement by Northwest Arctic Borough School District. The project consisted of constructing a 10,400 SF addition and renovate the existing 5,600 sf facility.

Guest User
December 1, 2020
Construction

F-22 Corrosion Control Hangar

Guest User
December 1, 2020
Construction
F-22 Corrosion Control Hangar

Bethel was the Prime Contractor for the design and construction of this two-bay, 23,000 SF Corrosion Control Hangar supporting Low-Observable and Composite Repair Maintenance for F-22 Aircraft on JBER, Alaska.

Guest User
December 1, 2020
Construction

Napaskiak K-12 Replacement School

Guest User
December 1, 2020
Construction

Bethel was contracted to construct a 42,500 sf new school for grades Kindergarten through 12 in the remote village of Napaskiak, Alaska by the Lower Kuskokwim School District. Napaskiak is approximately 7 miles from Bethel AK.

Jimmie Nelson
December 1, 2020
Construction

Kwethluk K-12 Replacement School

Jimmie Nelson
December 1, 2020
Construction
Kwethluk K-12 Replacement School

Bethel was contracted to construct a 48,500sf two story replacement school and utility building in the remote village of Kwethluk, Alaska by the Lower Kuskokwim School District. Kwethluk is approximately 12 miles from Bethel AK.

Guest User
November 30, 2020
Construction

Northwest Magnet School Addition and Renovation

Guest User
November 30, 2020
Construction
Northwest Magnet School Addition and Renovation

Bethel was contracted to construct a 27,600 sf renovation and an addition of a new 7,000 SF industrial studies training area.at the Northwest Magnet School in Kotzebue, AK by the Northwest Arctic School District.

Lisa Maserjian
November 30, 2020
Wet Utilities

Water Main Replacement

Lisa Maserjian
November 30, 2020
Wet Utilities
Water Main Replacement

Bethel was contracted by the Naval Facilities Engineering Command Southwest (NAVFAC SW) to replace a water main at the Harvey Field, Facility 50117 on the China Lake Naval Air Weapons Station (NAWS) which was damaged during a 7.1 magnitude earthquake.

Guest User
November 30, 2020
Construction

United States Coast Guard Housing

Guest User
November 30, 2020
Construction
United States Coast Guard Housing

Bethel was contracted to construct a community of 26 family housing units, including roads, utilities, and recreational facilities for the U.S. Coast Guard in Cordova, Alaska, including a total of over 60,000 SF of new construction.

Guest User
November 30, 2020
Construction

Bethel Youth Facility

Guest User
November 30, 2020
Construction
Bethel Youth Facility

Bethel-UNIT JV was contracted as the Design-Build contractor for the renovation and addition to the Youth Detention Facility in Bethel, Alaska.

Guest User
November 30, 2020
Construction

Yukon Kuskokwim Regional Aquatic Health & Safety Center

Guest User
November 30, 2020
Construction
Yukon Kuskokwim Regional Aquatic Health & Safety Center

Bethel was the Design-Build contractor for the new two-story building of approximately 27,200 SF in Bethel, Alaska. The building accommodates a six lane swimming pool, spa, running track, water slide, exercise rooms and other community use areas.

Guest User
November 27, 2020
Construction

Eielson AFB Bowling Center

Guest User
November 27, 2020
Construction
Eielson AFB Bowling Center

Bethel was the Design-Build contractor for the construction of a new 12-lane bowling facility with food and beverage service, a pro shop, and multi-purpose spaces. The new 17,124 SF structure replaced the existing bowling facility.

Newer Posts
Older Posts
 
Back to Top