Home
Services
Engineering & Environmental Consulting
Operations & Maintenance
Environmental Remediation
Vertical Construction
Water & Wastewater
Apparel Manufacturing
Geography
Careers
Contact Us

Bethel Companies

Home
Services
Engineering & Environmental Consulting
Operations & Maintenance
Environmental Remediation
Vertical Construction
Water & Wastewater
Apparel Manufacturing
Geography
Careers
Contact Us
June 27, 2024
Construction
Guest User
Egegik City Shop

The City Shop is a 90’x150’ clear span metal building with 20’ eave heights. The building includes a concrete foundation, floor slab, exterior aprons, and a steel structure with insulated metal siding panels. Due to the extreme weather in Egegik, the building was designed to withstand wind and snow loads, as well as the seismic effects prescribed for the geographical area.

Egegik City Shop
October 1, 2018
Remediation
Samantha Baker
Nome Tank Demolition and Contaminated Soil ...

Bethel was contracted to perform a tank demolition and contaminated soil removal action and remediation at this FUDS.

Nome Tank Demolition and Contaminated Soil Removal
September 1, 2017
Operations
Samantha Baker
Polychlorinated Biphenyl (PCB) Management

Kadena Air Base requires support services to manage and process polychlorinated biphenyl (PCB) items in accordance with the latest Japanese Environmental Governing Standards (JEGS) and Toxic Substances Control Act (TSCA).

Polychlorinated Biphenyl (PCB) Management
March 14, 2017
Consulting
Samantha Baker
Compliance Monitoring at Two Sites, Camp Zama

Biannual compliance sampling is part of the compliance-related cleanup project plans for both the Camp Zama Old Landfill (CZOL) and the Logistics Readiness Center (LRC) Gas Station at Camp Zama, Japan. CZOL is a reclaimed landfill and currently supports a golf driving range, skeet range, and other uses.

Compliance Monitoring at Two Sites, Camp Zama
Guest User
November 27, 2020
Construction

Yuut Elitnaurviat Dormitory

Guest User
November 27, 2020
Construction
Yuut Elitnaurviat Dormitory

Bethel constructed an 8,788 sf two story 68-bed dormitory within the existing 10-acre Yuut Elitnaurviat People's Learning Center Campus in Bethel, Alaska. The building provided a combination of bunk-beds and efficiency apartments.

Ella Wrenn
February 29, 2020
Remediation

Garage Drain Investigation and Remediation

Ella Wrenn
February 29, 2020
Remediation
Garage Drain Investigation and Remediation

Bethel conducted an investigation and removal action of soil near a vehicle garage floor drain outfall at Mica Peak, Washington.

Lisa Maserjian
November 30, 2019
Wet Utilities

Wastewater Treatment Plant Replacement

Lisa Maserjian
November 30, 2019
Wet Utilities
Wastewater Treatment Plant Replacement

Bethel was contracted by the United States Air Force to provide and install a complete wastewater treatment plant (WWTP) at Joint Base San Antonio-Camp Bullis (JBSA-Camp Bullis) in San Antonio, Texas.

Lisa Maserjian
September 30, 2019
Operations

AFFF Replacement and Disposal

Lisa Maserjian
September 30, 2019
Operations
AFFF Replacement and Disposal

Bethel was contracted to provide environmental support to facilitate transition to US Air Force fire suppression systems at five specified installations in Germany, United, Kingdom, and Curacao from using C8 AFFF to a more environmentally friendly fire suppression product.

Ella Wrenn
April 30, 2019
Remediation

Shreveport Soil Remediation

Ella Wrenn
April 30, 2019
Remediation
Shreveport Soil Remediation

Bethel removed lead-contaminated soil (LCS) from beneath the roof of the VOR navigational aid structure at the Shreveport Downtown Airport

Lisa Maserjian
December 31, 2018
Wet Utilities

Water Main and Pipeline Installation

Lisa Maserjian
December 31, 2018
Wet Utilities
Water Main and Pipeline Installation

Bethel was contracted by the City of Bethel to install 7,300 linear feet (LF) of new water main pipeline and provide electrical and mechanical upgrades to the Bethel Subdivision Water Treatment Plant (SWTP) in Bethel, Alaska.

Lisa Maserjian
December 31, 2018
Wet Utilities

Water Tank Inspection and Cleaning

Lisa Maserjian
December 31, 2018
Wet Utilities
Water Tank Inspection and Cleaning

Bethel was contracted by the City of Bethel to inspect and clean the interior and exterior of two potable 426,300 gallon and 500,000 gallon water tanks.

Ella Wrenn
October 29, 2018
Consulting

Supplemental Soil Investigation to Support F‑35 Facilities Construction

Ella Wrenn
October 29, 2018
Consulting
Supplemental Soil Investigation to Support F‑35 Facilities Construction

Bethel was contracted to conduct a soil investigation at nine distinct sites on Eielson AFB in support of future construction of F-35 facilities by others.

Ella Wrenn
October 25, 2018
Consulting

Clean Water Act Permit Compliance Support for JBER

Ella Wrenn
October 25, 2018
Consulting
Clean Water Act Permit Compliance Support for JBER

Bethel was contracted to provide environmental services to support JBER in maintaining compliance with various storm- and waste- water permits under the Clean Water Act.

Ella Wrenn
October 25, 2018
Consulting

Remedial Investigation at Former Atlas "D" Missile Site

Ella Wrenn
October 25, 2018
Consulting
Remedial Investigation at Former Atlas "D" Missile Site

Bethel conducted a supplemental remedial investigation of TCE impacts to groundwater at a former Atlas “D” ICBM launch site at FE Warren AFB, near Cheyenne, WY.

Newer Posts
Older Posts
 
Back to Top