June 27, 2024
Construction
Guest User
Egegik City Shop

The City Shop is a 90’x150’ clear span metal building with 20’ eave heights. The building includes a concrete foundation, floor slab, exterior aprons, and a steel structure with insulated metal siding panels. Due to the extreme weather in Egegik, the building was designed to withstand wind and snow loads, as well as the seismic effects prescribed for the geographical area.

Egegik City Shop
October 1, 2018
Remediation
Samantha Baker
Nome Tank Demolition and Contaminated Soil ...

Bethel was contracted to perform a tank demolition and contaminated soil removal action and remediation at this FUDS.

Nome Tank Demolition and Contaminated Soil Removal
September 1, 2017
Operations
Samantha Baker
Polychlorinated Biphenyl (PCB) Management

Kadena Air Base requires support services to manage and process polychlorinated biphenyl (PCB) items in accordance with the latest Japanese Environmental Governing Standards (JEGS) and Toxic Substances Control Act (TSCA).

Polychlorinated Biphenyl (PCB) Management
March 14, 2017
Consulting
Samantha Baker
Compliance Monitoring at Two Sites, Camp Zama

Biannual compliance sampling is part of the compliance-related cleanup project plans for both the Camp Zama Old Landfill (CZOL) and the Logistics Readiness Center (LRC) Gas Station at Camp Zama, Japan. CZOL is a reclaimed landfill and currently supports a golf driving range, skeet range, and other uses.

Compliance Monitoring at Two Sites, Camp Zama
Samantha Baker
October 1, 2018
Remediation

Nome Tank Demolition and Contaminated Soil Removal

Samantha Baker
October 1, 2018
Remediation
Nome Tank Demolition and Contaminated Soil Removal

Bethel was contracted to perform a tank demolition and contaminated soil removal action and remediation at this FUDS.

Samantha Baker
October 1, 2018
Consulting

Long Term Monitoring and Remedial Action Operations

Samantha Baker
October 1, 2018
Consulting
Long Term Monitoring and Remedial Action Operations

Bethel was contracted to provide environmental long term management (LTM) at 26 611th Civil Engineering Squadron sites throughout Alaska.

Ella Wrenn
September 30, 2018
Consulting

Mount Santa Rosa Release Investigation

Ella Wrenn
September 30, 2018
Consulting
Mount Santa Rosa Release Investigation

Bethel conducted a site investigation at the FAA Mount Santa Rosa ARSR in Guam to delineate the lateral and vertical extent of diesel fuel contamination in subsurface soil.

Ella Wrenn
September 30, 2018
Operations

Hazardous Waste Management at Misawa AB, Japan

Ella Wrenn
September 30, 2018
Operations
Hazardous Waste Management at Misawa AB, Japan

Bethel managed and operated the Hazardous Waste Storage Area at Misawa AB, Japan.

Ella Wrenn
December 31, 2017
Operations

Burbank Localizer Decommissioning

Ella Wrenn
December 31, 2017
Operations
Burbank Localizer Decommissioning

Bethel was retained by the FAA to remove a localizer platform at the west end of Runway 8 at the Bob Hope International Airport in Burbank, California. The platform was constructed of wood decking, support beams, staircase, hand railings, and supported by subgrade concrete foundations. The wood was partially painted with lead-based paint (LBP).

Ella Wrenn
December 26, 2017
Remediation

Contaminates Removal Action at Black Rapids Airstrip

Ella Wrenn
December 26, 2017
Remediation
Contaminates Removal Action at Black Rapids Airstrip

Bethel conducted a removal action of lead- and zinc- contaminated soil from near the Black Rapids Airstrip.

Samantha Baker
December 20, 2017
Consulting

Cold Bay Groundwater/Vapor Sampling and Feasibility Study

Samantha Baker
December 20, 2017
Consulting
Cold Bay Groundwater/Vapor Sampling and Feasibility Study

Bethel was contracted by the FAA to perform a feasibility study (FS) at six contaminated sites associated with fuel releases from former USTs that represent great challenges to remediate due to the depths and concentrations of contaminants, which equate to costly cleanups.

Ella Wrenn
October 31, 2017
Consulting

Mount Ka'ala Release Investigation

Ella Wrenn
October 31, 2017
Consulting
Mount Ka'ala Release Investigation

Bethel completed a soil release investigation (RI) at the Mount Ka’ala ARSR facility in Oahu, Hawaii.

Samantha Baker
September 1, 2017
Operations

Polychlorinated Biphenyl (PCB) Management

Samantha Baker
September 1, 2017
Operations
Polychlorinated Biphenyl (PCB) Management

Kadena Air Base requires support services to manage and process polychlorinated biphenyl (PCB) items in accordance with the latest Japanese Environmental Governing Standards (JEGS) and Toxic Substances Control Act (TSCA).

Ella Wrenn
July 31, 2017
Remediation

Woody Island Lead-Contaminated Soil Removal

Ella Wrenn
July 31, 2017
Remediation
Woody Island Lead-Contaminated Soil Removal

Bethel removed 410 CY of lead-contaminated soil from beneath a VOR overhead counterpoise on Woody Island, near Kodiak, Alaska.